192nd CulvertReplacement
The 192nd Culvert project included options analysis on the type of culvert and alignment and all the associated required permits, including the traffic control.
The 192nd Culvert project included options analysis on the type of culvert and alignment and all the associated required permits, including the traffic control.
Red Barn supplied civil engineering services for a 42-story mixed-use building with approximately 200 units. The project required coordination with SDOT
TALI Hall is the second building on the Eastside Preparatory campus where a member of the Red Barn Staff has been the lead civil engineer/project manager.